The existing waterproofing which had failed and was leaking into the unit below had to be taken up. The Protect & Seal time used a floor grinder to bring up the existing waterproofing and bring it back to the original concrete.
Once completed, the waterproofing process began. This started with the use of a primer followed by the waterproofing membrane and construction silicon, sealing up the floor and all junctions. After this process was completed, we commenced with the tiling of the balcony using a 300mm x 600mm concrete grey look tile and a 100mm skirting tile around the perimeter of the balcony.